Before submitting your enquiries:
1) You are suggested to read all our replies to the enquiries in the following section before submitting your enquiries.
2) Enquiries will only be received and responded to via emails. Any telephone or facsimile enquiries would not be entertained.
3) All enquiries should be sent to the email address: park.eoi.pmc@wkcda.hk
4) All enquiries submitted must be in English.
5) All answers to enquiries will be posted onto this website as soon as possible.
6) The closing date for enquiries related to Project Management Consultant EOI is 12:00 noon 12 November 2012 (Hong Kong Time).
7) Verbal or anonymous enquiries will not be entertained.
|
1. Please kindly confirm the following information: 1.1 What is the construction value of the Park Development? Phase I and Phase II. (Response to 1.1) |
|
|
1.2 What font style needs to be used? Is Arial size 12 acceptable? (Response to 1.2) |
|
|
1.3 With the page limit of 10 pages does this include the front cover and contents pages? (Response to 1.3) |
|
1.4 Can Form C be included in the submission on A3 paper? (Response to 1.4) |
||
2. We note the requirement on Page 4 of the Request document that "... the DDC and all consultants in relation to the Park development will be barred from participating in the PMC selection and vice versa." We are a large international consultancy with diverse disciplines such that for this scale of project, several departments of our company would seek to tender for various consulting packages. Can you clarify: 2.1 If our design team took part in the DDC as a partner in a consortium and not sole provider, would our PM team still be barred from the PMC commission? (Response to 2.1) |
||
2.2 If our design team took part in the DDC as a sub-consultant, would our PM team still be barred from the PMC commission? (Response to 2.2) |
||
2.3 If our PMC was a Joint Venture would this affect our Design team undertaking the DDC commission? (Response to 2.3) |
||
2.4 If our PMC was formed by a team outside of our HK practice would our HK design teams be barred from the DDC (and vice versa)? (Response to 2.4) |
||
3 Our company will make an EOI submission for the role of Project Management Consultant for your Park Development. We are going to form a Joint Venture/Consortium for the EOI submission which may include other consultants. Can you please confirm that, in forming part of our Joint Venture/Consortium, the other consultants are also able to participate in the pre-qualification and/or tender processes for other (i.e. not the Project Management Consultant for the Park Development) consultant packages within the WKCDA. (Response to 3) |
||
4 Clause 7.4 of the Request for EOI refers to the submission format and contents allowed. However, it does not mention the “Last three years’ audited financial statements” as required in Clause 7.3 c). Please clarify. (Response to 4) |
||
5 We would be grateful if you can respond on the following enquiries: 5.1 Please confirm whether the attachments for the curriculum vitae of key personnel, the organization chart, letters of association, reference letters and Forms (A, B, C, D, E, F and G) are included in the 10 page limit (double sided) submission requirement or can be considered separately. (Response to 5.1) |
||
5.2 Please clarify the documents which form part of the 10 page limit (double sided) for the return submission? (Response to 5.2) |
||
5.3 Form G checklist item 1 refers to submission documents as per clause 2.2. Please confirm the location of clause 2.2 within the document? (Response to 5.3) |
||